Win-Win Gymnastics Team Training Center at 1710A Midway, Odenton
Photo Album: Work started in early January and completed on July 5th. 2012.
|
|||
In-ground pits are filled up; In-ground tumble track and trampoline are in place; The place will be soon filled with life and energy. | |||
|
|
|
|
Pits and Front Drive Way / Parking Read for County Inspection Photographed May 11, 2012 | |||
Pits Construction Progress Photographed March 7, 2012 | |||
Pits Construction Progress Photographed March 7, 2012 | |||
Pits Construction Progress Photographed in February 2012 Drainage System to Make Pits Stay Dry. | |||
Start to Dig the Loose Foam Pit | What is This pit? I Need to Check the Floor Plan. | How to Get the Concrete Slab out of the Way? | Resi-pit for Bar and 7x14 in-ground Trampoline |
Is the Trench Pit is of the Right Depth? | Resi-pit and Trench Pit for Bar and in-ground Trampoline | 40-foot in-ground Tumble Trak and 10x17 Resi-pit | 40-foot in-ground Tumble Trak and 10x17 Resi-pit for Tumbling from the Track and Floor |
So Small the Light Tubes, but So Bright! | Is the Roof Leak Fixed? | So Small the Light Tubes, but So Bright | Frame of the Restroom is Almost Done |
Get Ready for Construction Work. |
Plumbing Rough-in is Ready for County Inspection | A Lot to Do to Outside in the Front. |