Win-Win Gymnastics Team Training Center at 1710A Midway, Odenton 

Photo Album: Work started in early January  and completed on July 5th. 2012.

 
    In-ground pits are filled up;  In-ground tumble track and trampoline are in place; The place will be soon filled with life and energy.    

      Pits and Front Drive Way / Parking  Read for County Inspection   Photographed  May 11, 2012
                                                                                                                         Pits Construction Progress Photographed    March 7, 2012
                                                                                                                      Pits Construction Progress Photographed    March 7, 2012
                                   Pits Construction Progress Photographed  in February 2012                                                                                  Drainage System to Make Pits Stay Dry.           
      Start to Dig the Loose Foam Pit  What is This pit? I Need to Check the Floor Plan.  How to Get the Concrete Slab out of the Way?   Resi-pit for Bar and 7x14 in-ground Trampoline 
   Is the Trench Pit is of the  Right Depth? Resi-pit and Trench Pit for Bar and in-ground Trampoline   40-foot in-ground Tumble Trak and 10x17 Resi-pit 40-foot in-ground Tumble Trak and 10x17   Resi-pit for Tumbling from the Track and Floor
So Small the Light Tubes, but So Bright! Is the Roof Leak Fixed? So Small the Light Tubes, but So Bright      Frame of the Restroom  is Almost Done

Get Ready for Construction Work.

Plumbing Rough-in is Ready for County Inspection  A Lot to Do to Outside in the Front.